Mediterranean gas field production started ahead of schedule and with 30% cost savings with UNITECH’s 15K System
A UK Major has announced that one of their large Gas fields in the Mediterranean has achieved first production seven months ahead of schedule and at an initial cost saving of over 30%. UNITECH UH-575/550-X 15 kpsi connectors were delivered to both an engineering company in Norway and the installation contractor for use on this field’s HIPPS system. UNITECH is proud of being part of such achievement, this is yet another success for UNITECH working with operators on their production systems and assisting in early production and cost savings.
The 15k high flow connection solution from UNITECH has been used on many projects since 2009. Nearly 10 years of quality service to operators in all regions of the global Oil & Gas industry; from natural gas production field, a well capping device both in the North Sea, to deep-water fields in the Gulf of Mexico.
Contact UNITECH to see how we can help satisfy your flying lead and high flow connection system’s needs.